免费观看黄视频网站-免费观看黄网站-免费观看激色视频网站(性色)-免费观看毛片-免费观看毛片视频-免费观看毛片网站

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.yasing.com.cn/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 行業(yè)動態(tài)

臨邊護欄防護作業(yè)操作的事項介紹

來源:http://www.yasing.com.cn/   發(fā)布時間:2024-03-13

在臨邊護欄作業(yè)施工時重要的是,大于一切,但盡管三令五申強調(diào)作業(yè),但還是有很多企業(yè)違反規(guī)定沒有按照政策去施工,導(dǎo)致了生產(chǎn)問題時有發(fā)生,給和社會造成很大損失。因此頒布臨邊洞口作業(yè)施工標(biāo)準規(guī)范工地操作施工,這是繼91年標(biāo)準后2016年新的基本規(guī)定。

When working on edge guardrails, it is important to prioritize safety. Safety is paramount. Despite the country's repeated emphasis on safe operations, many enterprises still violate regulations and fail to follow national policies, resulting in frequent safety production issues and causing significant losses to the country and society. Therefore, the country has issued construction standards for edge opening operations to regulate the safe operation and construction of construction sites, which is a new basic regulation in 2016 following the 91 year standard.

1 建筑施工中凡涉及臨邊與洞口作業(yè)、攀登與懸空作業(yè)、操作平臺、交叉作業(yè)及網(wǎng)搭設(shè)的,應(yīng)在施工組織設(shè)計或施工方案中制定高處作業(yè)技術(shù)措施。

For construction involving edge and hole operations, climbing and suspended operations, operating platforms, cross operations, and safety net installation, safety technical measures for high-altitude operations should be formulated in the construction organization design or construction plan.

2 高處作業(yè)施工前,應(yīng)按類別對防護設(shè)施進行檢查、驗收,驗收合格后方可進行作業(yè),并應(yīng)做驗收記錄。驗收可分層或分階段進行。

20230315030529840.jpg

Before carrying out high-altitude operations, safety protection facilities should be inspected and accepted according to their categories. Only after passing the acceptance can operations be carried out, and acceptance records should be kept. Acceptance can be carried out in layers or stages.

3 高處作業(yè)施工前,應(yīng)對作業(yè)人員進行技術(shù)交底,并應(yīng)記錄。應(yīng)對初次作業(yè)人員進行培訓(xùn)。

Before carrying out high-altitude operations, safety technical briefing should be conducted to the workers and recorded. Training should be provided to first-time workers.

4 應(yīng)根據(jù)要求將各類警示標(biāo)志懸掛于施工現(xiàn)場各相應(yīng)部位,夜間應(yīng)設(shè)紅燈警示。高處作業(yè)施工前,應(yīng)檢查高處作業(yè)的標(biāo)志、工具、儀表、電氣設(shè)施和設(shè)備,確認其完好后,方可進行施工。

4. Various safety warning signs should be hung at the corresponding parts of the construction site according to requirements, and red lights should be set up for warning at night. Before carrying out high-altitude operations, safety signs, tools, instruments, electrical facilities, and equipment for high-altitude operations should be checked and confirmed to be in good condition before construction can proceed.

5 高處作業(yè)人員應(yīng)根據(jù)作業(yè)的實際情況配備相應(yīng)的高處作業(yè)防護用品,并應(yīng)按規(guī)定正確佩戴和使用相應(yīng)的防護用品、用具。

5. High altitude workers should be equipped with corresponding safety protection equipment according to the actual situation of the work, and should correctly wear and use the corresponding safety protection equipment and tools according to regulations.

6 對施工作業(yè)現(xiàn)場可能墜落的物料,應(yīng)及時拆除或采取固定措施。高處作業(yè)所用的物料應(yīng)堆放平穩(wěn),不得妨礙通行和裝卸。工具應(yīng)隨手放入工具袋;作業(yè)中的走道、通道板和登高用具,應(yīng)隨時清理干凈;拆卸下的物料及余料和廢料應(yīng)及時清理運走,不得隨意放置或向下丟棄。傳遞物料時不得拋擲。

6 pairs of materials that may fall on the construction site should be promptly removed or fixed measures taken. The materials used for high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading. Tools should be easily placed in a tool bag; The walkways, walkways, and high-altitude equipment used in homework should be cleaned at all times; The dismantled materials, surplus materials, and waste materials should be cleaned and transported away in a timely manner, and should not be arbitrarily placed or discarded downwards. Do not throw materials during transfer.

7 高處作業(yè)應(yīng)按現(xiàn)行標(biāo)準《建設(shè)工程施工現(xiàn)場消防技術(shù)規(guī)范》GB 50720的規(guī)定,采取防火措施。

7. Fire prevention measures should be taken for high-altitude operations in accordance with the current national standard GB 50720 Technical Code for Fire Safety at Construction Sites.

8 在雨、霜、霧、雪等天氣進行高處作業(yè)時,應(yīng)采取防滑、防凍和防雷措施,并應(yīng)及時作業(yè)面上的水、冰、雪、霜。當(dāng)遇有6級及以上強風(fēng)、濃霧、沙塵暴等惡劣氣候,不得進行露天攀登與懸空高處作業(yè)。雨雪天氣后,應(yīng)對高處作業(yè)設(shè)施進行檢查,當(dāng)發(fā)現(xiàn)有松動、變形、損壞或脫落等現(xiàn)象時,應(yīng)立即修理完善,維修合格后方可使用。

When working at heights in rainy, frosty, foggy, snowy or other weather conditions, anti slip, anti freezing, and lightning protection measures should be taken, and water, ice, snow, and frost should be promptly removed from the work surface. When encountering severe weather conditions such as strong winds of level 6 or above, dense fog, and sandstorms, outdoor climbing and suspended high-altitude operations are not allowed. After rainy and snowy weather, safety facilities for high-altitude operations should be inspected. If any looseness, deformation, damage or detachment are found, they should be repaired and improved immediately. Only after passing the repair can they be used.

9 對需臨時拆除或變動的防護設(shè)施,應(yīng)采取可靠措施,作業(yè)后應(yīng)立即恢復(fù)。

Reliable measures should be taken for safety protection facilities that need to be temporarily dismantled or changed, and they should be restored immediately after operation.

本文由工地圍擋提供幫助,更多的相關(guān)內(nèi)容請點擊http://www.yasing.com.cn希望本文能夠為您帶來幫助,感謝您的閱讀!

This article is provided by the construction site fence for assistance. For more related content, please click on http://www.yasing.com.cn I hope this article can be helpful to you. Thank you for reading!

主站蜘蛛池模板: 亚洲精品动漫3d一区二区| 一区二区三区在线免费看| 97久久精品国产成人影院| 国产精品免费视频一区| 国产99视频在线观看| 99热这里只精品99re66| 在线免费福利| 亚洲国产第一区二区香蕉| 四虎国产在线| 欧洲成人免费视频| 美女视频黄是免费的| 九色视频网| 国产精品麻豆高清在线观看| 26uuu在线视频| 亚洲精品久久玖玖玖玖| 神马影院我不卡手机| 欧美日韩中文视频| 久久久精品中文字幕| 狠狠色噜噜综合社区| 国产成人亚洲欧美激情| 97影院九七影院理论片| 香蕉视频国产精品| 日本一级网站| 美女在线视频观看影院免费天天看| 国产亚洲精品一区二区久久| 操穴影院| 一区二区三区四区在线观看视频 | 干美女网站| 最近中文字幕在线视频1| 亚洲精品乱码一区二区在线观看| 情趣色视频网站| 久久免费精品国产视频| 国产一级视频播放| se在线播放| 亚洲综合插插| 四虎精品在线视频| 久久亚洲精品中文字幕第一区 | 男人的天堂免费在线观看| 精品二区| 爱爱网站免费| 亚洲三级视频在线|